000 01128nam a2200349 a 4500
001 4945514
003 OSt
005 20260324133014.0
008 960913s1997 nyua 001 0 eng
010 _a 96036592
020 _a0824798007
_qhardcover
040 _aDLC
_cDLC
_dDLC
_diCATSUC
_beng
050 0 0 _aTA177.4
_b.C57 1997
082 0 0 _a658.1552
_220
_b/CLA
100 1 _aClark, Forrest D.,
_d1923-
_eauthor.
245 1 0 _aApplied cost engineering /
_cForrest D. Clark, A.B. Lorenzoni ; with contributions by Michael Jimenez.
250 _a3rd edn.
260 _aNew York :
_bMarcel Dekker,
_c1997.
300 _axiii, 419 p. :
_bill. ;
_c24 cm.
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
490 1 _aCost engineering ;
_v28
500 _aIncludes index.
650 0 _aEngineering economy.
650 0 _aCost control.
650 0 _aEngineering
_xEstimates.
700 1 _aLorenzoni, A. B.,
_d1928-
_eauthor.
700 1 _aJimenez, Michael.
_econtributor.
830 0 _aCost engineering (Marcel Dekker, Inc.) ;
_v28.
942 _2lcc
_cBOOKS
_n0
999 _c2657
_d2657